Construction of Mar Saba Church Hall – Phase 1







Project Scope:
The project comprises the construction of Mar Saba Chrch (Concrete Phase) with Built Area of 530m2 and Center Height of 12.25m
The works include:
- Concrete Works (RC Columns, Beams, Inclined Roof Slab)
Project Title
Client Private Client Location Kfarhay Category BuildingsRelated Projects

Rehabilitation of Stormwater Network in Tripoli, Syria Street
Buildings Construction
Construction of Mar Saba Church Hall – Phase 1
Buildings Construction
Thoum Lot 435 Villa – Phase 1, 2 & 3








Project Scope:
The project comprises the construction of a residential Villa with a Built Area of 280m2.
The works include:
- Excavation in hard Soil.
- Cyclopean Concrete Works
- Concrete works (RC Underground Reservoir, Columns, Slabs, Beams, etc…).
- Finishing Works (Block works, plastering, stone cladding)
Thoum Lot 435 Villa - Phase 1, 2 & 3
Client Private Client Location Thoum Category BuildingsRelated Projects

Construction of Mar Saba Church Hall – Phase 1
Buildings Construction
Thoum Lot 435 Villa – Phase 1, 2 & 3
Buildings Construction
Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon






Project Scope:
The project comprises the construction and rehabilitation of the stormwater network in Kfarhelda Village.
The works include:
- Trench Excavation
- Laying of concrete pipes (diam 600mm and 500mm)
- Bedding and Bakcfilling.
- Concrete works (inlet structures).
- Earth Channel Construction.
- Steel Grid Installation.
- Asphalt Reinstatement.
Serenity Apartments Project
Client Chemonics s.a.r.l Location Kfarhelda Category InfrastructureRelated Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon
Infrastructure
Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach
Infrastructure
Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach









Project Scope:
The project comprises the contruction and rehabilitation of the exisiting Channel in Arde and the weir Construction in Aachach Village.
The works include:
- Trench Excavation.
- Reinforced Concrete U Channles
- Reinforced Concrete Weir.
- Steel Gates Installation
- Riprap Fill works
Project Title
Client Chemonics s.a.r.l Location Aachach-Arde Category InfrastructureRelated Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon
Infrastructure
Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach
Infrastructure
Construction of sewer lines in the locality of Haret Al Fouar- North Lebanon











Project Scope:
The project comprises the construction of e sewer Line in Mhammara Village. (1,830 lm)
The works include:
- Trench Excavation.
- Laying of uPVC pipes (diam 250mm and 200mm)
- Bedding and Bakcfilling.
- Concrete works (Manholes).
- Asphalt Reinstatement.
Project Title
Client European Co Date June 2020 Category ConstructionRelated Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon
Infrastructure
Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach
Infrastructure
Construction of sewer lines in the locality of Haret Al Fouar- North Lebanon
Infrastructure
Construction of sewer lines in the locality of Mhammara – North Lebanon





Project Scope:
The project comprises the construction of e sewer Line in Fouar Village. (1,830 lm)
The works include:
- Trench Excavation.
- Laying of uPVC pipes (diam 250mm).
- Bedding and Backfilling.
- Concrete works (Manholes).
- Asphalt Reinstatement.
Project Title
Client Chemonics s.a.r.l Date June 2020 Category ConstructionRelated Projects

Rehabilitation of Stormwater Network in Tripoli, Syria Street
Infrastructure
Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon
Infrastructure