Vendiamo orologi di alta qualità dalla Germania senza dogana. Gli repliche orologi sono assemblati e controllati in Germania con la massima cura nei minimi dettagli. Offri solo la qualità migliore e testata! Guarda la consegna globale in fabbrica Visita il sito Web per più stili

replica rolex

Orologi Replica
We focus on the entire process of the project, concept through completion

We are a leading company, serving clients around the globe

Our experience combined with our dedication to providing outstanding customer service and quality projects, has helped Byron become a leader in construction management

Construction of Mar Saba Church Hall – Phase 1

Image Image Image Image Image Image Image

Project Scope:
The project comprises the construction of Mar Saba Chrch (Concrete Phase) with Built Area of 530m2 and Center Height of 12.25m
The works include:

  • Concrete Works (RC Columns, Beams, Inclined Roof Slab)     

Project Title

Client Private Client Location Kfarhay Category Buildings

Related Projects

Rehabilitation of Stormwater Network in Tripoli, Syria Street

Buildings Construction

Construction of Mar Saba Church Hall – Phase 1

Buildings Construction

Thoum Lot 435 Villa – Phase 1, 2 & 3

Image Image Image Image Image Image Image Image

Project Scope:

The project comprises the construction of a residential Villa with a Built Area of 280m2.

The works include:

  • Excavation in hard Soil.
  • Cyclopean Concrete Works
  • Concrete works (RC Underground Reservoir, Columns, Slabs, Beams, etc…).
  • Finishing Works (Block works, plastering, stone cladding)

Thoum Lot 435 Villa - Phase 1, 2 & 3

Client Private Client Location Thoum Category Buildings

Related Projects

Construction of Mar Saba Church Hall – Phase 1

Buildings Construction

Thoum Lot 435 Villa – Phase 1, 2 & 3

Buildings Construction

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon

Image Image Image Image Image Image

Project Scope:

The project comprises the construction and rehabilitation of the stormwater network in Kfarhelda Village.
The works include:

  • Trench Excavation
  • Laying of concrete pipes (diam 600mm and 500mm)
  • Bedding and Bakcfilling.
  • Concrete works (inlet structures).
  • Earth Channel Construction.
  • Steel Grid Installation.
  • Asphalt Reinstatement.

Serenity Apartments Project

Client Chemonics s.a.r.l Location Kfarhelda Category Infrastructure

Related Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon

Infrastructure

Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach

Infrastructure

Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach

Image Image Image Image Image Image Image Image Image

Project Scope:
The project comprises the contruction and rehabilitation of the exisiting Channel in Arde and the weir Construction in Aachach Village.
The works include:

  • Trench Excavation.
  • Reinforced Concrete U Channles
  • Reinforced Concrete Weir.
  • Steel Gates Installation
  • Riprap Fill works

Project Title

Client Chemonics s.a.r.l Location Aachach-Arde Category Infrastructure

Related Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon

Infrastructure

Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach

Infrastructure

Construction of sewer lines in the locality of Haret Al Fouar- North Lebanon

Image Image Image Image Image Image Image Image Image Image Image

Project Scope:
The project comprises the construction of e sewer Line in Mhammara Village. (1,830 lm)
The works include:

  • Trench Excavation.
  • Laying of uPVC pipes (diam 250mm and 200mm)
  • Bedding and Bakcfilling.
  • Concrete works (Manholes).
  • Asphalt Reinstatement.

Project Title

Client European Co Date June 2020 Category Construction

Related Projects

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon

Infrastructure

Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach

Infrastructure

Construction of sewer lines in the locality of Haret Al Fouar- North Lebanon

Infrastructure

Construction of sewer lines in the locality of Mhammara – North Lebanon

Image Image Image Image Image

Project Scope:
The project comprises the construction of e sewer Line in Fouar Village. (1,830 lm)
The works include:

  • Trench Excavation.
  • Laying of uPVC pipes (diam 250mm).
  • Bedding and Backfilling.
  • Concrete works (Manholes).
  • Asphalt Reinstatement.

Project Title

Client Chemonics s.a.r.l Date June 2020 Category Construction

Related Projects

Rehabilitation of Stormwater Network in Tripoli, Syria Street

Infrastructure

Rehabilitation of stormwater works in five locations in Kfarhilda Village, North Lebanon

Infrastructure

Construction of irrigation channels in Aachach/Meriata/Arde and a distribution unit in Aouyoun Aachach

Infrastructure

Our Clients

Generating more value at every level and building a better world for everyone

replika órák

Who sells the best replica rolex watches? You'll find all the answers on our website bestwatches.is