Project Scope:
The project comprises the rehabilitation of Stormwater Network in Syria Street, Tabaneh for a total length of 140 m.
The works include:
- Trench Excavation.
- Sand Bedding.
- Laying of Reinforced Concrete pipes with diam of 500 and 600mm.
- Structural Backfilling.
- Construction of Reinforced Concrete Manholes with a depth of 5m.
- Construction of Concrete Interceptors.
- Pavement Reinstatement.
Project Title
Client
ACTED
Location
Tebbeneh, Tripoli
Category
Infrastructure
Consultant
KREDO